Skip to main content

PLEASE NOTE: We are currently experiencing issues with articles from the AIAA Journal not adding to our shopping cart (for transactional sales of individual articles only). This ONLY affects the AIAA Journal. All other journal titles should work as expected. We apologize for this inconvenience. Please contact [email protected] for help with any urgent article requests. Thank you.

AIAA SPACE and Astronautics Forum and Exposition
12 - 14 Sep 2017
Orlando, FL
eISBN: 978-1-62410-483-1

Table of Contents

No Access
Progress and Plans for SNC’s NextSTEP-2 Deep Space Habitat
AIAA 2017-5102
COL-01: Low Earth Orbit and Cislunar Habitation • Tuesday, 12 September 2017 • 1115 hrs
No Access
Vanguard: A Common Habitable Module for Future Space Endeavors
AIAA 2017-5104
COL-01: Low Earth Orbit and Cislunar Habitation • Tuesday, 12 September 2017 • 1215 hrs
No Access
No Access
Electrodynamic Gravity Generator for Artificial Gravity Modules
AIAA 2017-5140
COL-02: Artificial Gravity and Enabling Life Support • Tuesday, 12 September 2017 • 1600 hrs
No Access
An Extensible and Affordable Exploration Architecture
AIAA 2017-5147
EXPL-01: Human Exploration in LEO and Cislunar Space • Tuesday, 12 September 2017 • 1730 hrs
No Access
Compensating for Cryogenic Propellant Boiloff for a Cargo Mission to Mars
AIAA 2017-5274
EXPL-04: Advanced Propulsion and Power Systems • Wednesday, 13 September 2017 • 1630 hrs
No Access
Fusion-Enabled Pluto Orbiter and Lander
AIAA 2017-5276
EXPL-04: Advanced Propulsion and Power Systems • Wednesday, 13 September 2017 • 1730 hrs
No Access
NASA Centennial Challenge: 3D-Printed Habitat
AIAA 2017-5279
EXPL-05: In-Space Manufacturing and Assembly • Wednesday, 13 September 2017 • 1700 hrs
No Access
Roles for Space Assembly and Servicing in an Affordable Human Exploration Architecture
AIAA 2017-5280
EXPL-05: In-Space Manufacturing and Assembly • Wednesday, 13 September 2017 • 1730 hrs
No Access
No Access
Deep Space Autonomous Navigation Options for Future Missions
AIAA 2017-5369
EXPL-09: Advanced Concepts and Technologies • Thursday, 14 September 2017 • 1600 hrs
No Access
The Lunar Space Elevator, a Near Term Means to Reduce Cost of Lunar Access
AIAA 2017-5372
EXPL-09: Advanced Concepts and Technologies • Thursday, 14 September 2017 • 1730 hrs
No Access
Project Theseus
AIAA 2017-5373
EXPL-10: Mission Architectures (Student Design Teams) • Thursday, 14 September 2017 • 1530 hrs
No Access
Ultima Thule
AIAA 2017-5374
EXPL-10: Mission Architectures (Student Design Teams) • Thursday, 14 September 2017 • 1600 hrs
No Access
Interplanetary Teleoperations Vehicle Architecture for Human Missions to Mars
AIAA 2017-5377
EXPL-10: Mission Architectures (Student Design Teams) • Thursday, 14 September 2017 • 1730 hrs
No Access
No Access
The Rise of Long-lived Complex Systems
AIAA 2017-5230
HSP-02: Space History and Policy • Wednesday, 13 September 2017 • 1000 hrs
No Access
No Access
A New Algorithm for Star Trackers: Frame Scoring
AIAA 2017-5110
IS-01: Intelligent Systems for Exploration • Tuesday, 12 September 2017 • 1115 hrs
No Access
No Access
Next Generation Low SWaP SPACE Cyber
AIAA 2017-5173
NSS-01: Innovation • Tuesday, 12 September 2017 • 1630 hrs
No Access
No Access
Integrated Circuit Lifecycle Security Best Practices
AIAA 2017-5240
NSS-02: Advanced Concepts • Wednesday, 13 September 2017 • 1100 hrs
No Access
Students Solving Authentic Space Exploration Challenges: Micro-g NExT
AIAA 2017-5112
OPS-01: Technological Approaches to Solve Various Operational Challenges • Tuesday, 12 September 2017 • 1045 hrs
No Access
Operational Assessment of Apollo Lunar Surface Extravehicular Activity Metabolic Rate
AIAA 2017-5115
OPS-01: Technological Approaches to Solve Various Operational Challenges • Tuesday, 12 September 2017 • 1215 hrs
No Access
Understanding the Drivers of Cost and Staffing Growth in Operating Earth Orbiting Science Missions
AIAA 2017-5242
OPS-02: New Mission Ops Concepts to Exploring the Universe • Wednesday, 13 September 2017 • 1000 hrs
No Access
Sentinel 2B LEOP Flight Dynamics Operational experience
AIAA 2017-5243
OPS-02: New Mission Ops Concepts to Exploring the Universe • Wednesday, 13 September 2017 • 1030 hrs
No Access
Software-defined radio baseband for satellite management systems
AIAA 2017-5244
OPS-02: New Mission Ops Concepts to Exploring the Universe • Wednesday, 13 September 2017 • 1100 hrs
No Access
Solenoid moon-base concept
AIAA 2017-5205
PSTR-01: Human Habitation and Development of Space Posters • Tuesday, 12 September 2017 • 1930 hrs
No Access
Development and Construction of Operational Modules for Planetary Habitat Research
AIAA 2017-5206
PSTR-01: Human Habitation and Development of Space Posters • Tuesday, 12 September 2017 • 1930 hrs
No Access
ENGINEER THE SYSTEM The Science of Successful System Engineering and Integration
AIAA 2017-5222
PSTR-06: Space Systems Engineering Posters • Tuesday, 12 September 2017 • 1930 hrs
No Access
Use of Model-Based Design for Propulsion Simulation
AIAA 2017-5223
PSTR-06: Space Systems Engineering Posters • Tuesday, 12 September 2017 • 1930 hrs
No Access
3D Printing Force-Aware Material and Cost Reduction Algorithm
AIAA 2017-5226
PSTR-08: Green Energy Posters • Tuesday, 12 September 2017 • 1930 hrs
No Access
No Access
Plasma Actuators to reduce Space Mission Costs
AIAA 2017-5177
RIS-02: Reinventing Space II • Tuesday, 12 September 2017 • 1600 hrs
No Access
Small Body Precision Landing via Convex Model Predictive Control
AIAA 2017-5179
RSA-02: Space Robotics and Automation II • Tuesday, 12 September 2017 • 1530 hrs
No Access
Testing Gecko-Like Adhesives Aboard the International Space Station
AIAA 2017-5181
RSA-02: Space Robotics and Automation II • Tuesday, 12 September 2017 • 1630 hrs
No Access
No Access
Spacecraft Component Recognition using a Codebook of Texton Images
AIAA 2017-5308
RSA-04: Space Robotics and Automation IV • Wednesday, 13 September 2017 • 1530 hrs
No Access
A CubeSat Test Mission to Advance In-Space 3D-Printing
AIAA 2017-5189
SATS-02: Small Satellites II • Tuesday, 12 September 2017 • 1630 hrs
No Access
Towards a ‘Secondary’ Payload Bill of Rights
AIAA 2017-5321
SATS-05: Small Satellites V • Wednesday, 13 September 2017 • 1700 hrs
No Access
Quantifying the Impact of Redundancy and Commonality on System Survivability
AIAA 2017-5125
SLS-01: Campaign Planning - Methods and Analysis • Tuesday, 12 September 2017 • 1145 hrs
No Access
Impact Evaluation of In-Space Additive Manufacturing on Modularized Geostationary Platforms
AIAA 2017-5253
SLS-02: Advanced Supportability, Robotic Servicing, and Commercial Opportunities • Wednesday, 13 September 2017 • 1000 hrs
No Access
Commercial Airlock for the International Space Station
AIAA 2017-5254
SLS-02: Advanced Supportability, Robotic Servicing, and Commercial Opportunities • Wednesday, 13 September 2017 • 1030 hrs
No Access
Designing Spacecraft to Enable Robotic Servicing
AIAA 2017-5255
SLS-02: Advanced Supportability, Robotic Servicing, and Commercial Opportunities • Wednesday, 13 September 2017 • 1100 hrs
No Access
Mixed-Integer Linear Fractional Programming Approach to Mission Planning for Lunar Mining
AIAA 2017-5347
SLS-03: Advanced Space Logistics Infrastructures and Campaign Planning - Modeling and Simulation • Thursday, 14 September 2017 • 1000 hrs
No Access
Built-in Flexibility for Space Logistics Mission Planning and Spacecraft Design
AIAA 2017-5348
SLS-03: Advanced Space Logistics Infrastructures and Campaign Planning - Modeling and Simulation • Thursday, 14 September 2017 • 1030 hrs
No Access
Analytical model of Space Infrastructure Staged Deployment Strategy in Space Logistics
AIAA 2017-5349
SLS-03: Advanced Space Logistics Infrastructures and Campaign Planning - Modeling and Simulation • Thursday, 14 September 2017 • 1100 hrs
No Access
No Access
No Access
Case Study of European Mars Missions utilizing System Design and Management Methods
AIAA 2017-5324
SSEE-06: Space Systems Engineering and Economics • Wednesday, 13 September 2017 • 1530 hrs
No Access
CCSDS can not be ignored when looking beyond the horizon
AIAA 2017-5326
SSEE-06: Space Systems Engineering and Economics • Wednesday, 13 September 2017 • 1630 hrs
No Access
A Congress-Based Value Model for NASA Funding Allocation
AIAA 2017-5327
SSEE-06: Space Systems Engineering and Economics • Wednesday, 13 September 2017 • 1700 hrs
No Access
No Access
No Access
No Access
Stratospheric-Airship-Assisted Orbital Payload Launching System
AIAA 2017-5263
ST-03: Space Launch and Ground Operations • Wednesday, 13 September 2017 • 1130 hrs
No Access
No Access
Spacecraft Thruster Distribution Matrix for Precision 6DOF Control
AIAA 2017-5203
SYS-02: Subsystems and Modeling • Tuesday, 12 September 2017 • 1730 hrs
No Access
No Access
No Access
Design Study of a Rocket-powered Hopper Mission to Triton
AIAA 2017-5337
SYS-05: Mission Concepts and Analysis • Wednesday, 13 September 2017 • 1630 hrs
No Access
A hybrid craft using an inertial mass modification device
AIAA 2017-5343
SYS-06: Technology and Performance • Wednesday, 13 September 2017 • 1630 hrs
No Access
LISA Pathfinder CPS Design & Operational Overview
AIAA 2017-5344
SYS-06: Technology and Performance • Wednesday, 13 September 2017 • 1700 hrs
No Access
A Permanent Solution to Near-Earth Orbital Debris
AIAA 2017-5345
SYS-06: Technology and Performance • Wednesday, 13 September 2017 • 1730 hrs
No Access
Analysis of an Experimental Space Debris Removal Mission
AIAA 2017-5346
SYS-06: Technology and Performance • Wednesday, 13 September 2017 • 1800 hrs
No Access
Parametric Sizing Equations for Earth Observation Satellites
AIAA 2017-5362
SYS-07: Systems Analysis • Thursday, 14 September 2017 • 1130 hrs
No Access